When NASCAR came to Texas, it did it in a big way. Texas Motor Speedway was one of the largest and most complex engineering projects completed in the U.S. in the 1990s. The fast-track Design Build project began with only five sheets of plans and enough information to drill structural piers. A footprint plan, showing only the track and buildings, was the starting point for a project that eventually required over 125 separate design and construction drawings. The entire construction process was completed in a record-breaking 18-month time frame – on time and on budget, despite heavy spring rains that significantly impacted final construction phases.
Related Projects
2100 McKinney
2100 McKinney is a 19 story, Class A, Energy Star rated office property that is…
Angelika Film Center Dallas
Located in Mockingbird Station Center, this theatre specializes in independent films. It opened August 3,…
Bent Tree Country Club
A 66,000 square foot, two-level clubhouse with a Hill Country design aspect including primarily stone…
Reunion Tower
System Electric Co. is very proud to have been a team member on the repositioning…
Contact System Electric Co. Today
Your Choice For Electrical Services in Fort Worth & Dallas

